CanFab Production Lead Time (1.5 to 10-Ton Equipment) 2/18/2020

ROOF CURBS LEADTIME*
KNOCKED DOWN 8-9
PITCHED / WELDED 9-10
ISOLATION 9-10
ECONOMIZERS LEADTIME*
DOWN DISCHARGE8-9 9-10
HORIZONTAL DISCHARGE 9-10
MIXING BOXES 9-10
POWER EXHAUSTS LEADTIME*
CONSTANT VOLUME 9-10
MODULATING 9-10
ADAPTER CURBS LEADTIME*
QUICK SHIP (1 to 3 Curbs) 1
STANDARD (1 to 3 Curbs) 3-5
CUSTOM 12-13
*Lead-time in Business Days:
  • Lead-times are subject to change based on current workload and does not apply to custom parts.
  • Contact factory for lead-times on equipment 12.5 tons & over
  • Consult CanFab for large order lead-times.

Quick Ship Adapters

  • Next day ship 1.5 to 15-ton curbs guaranteed.
  • Next Day Ship, when P.O. received by 10:00AM (Ships next business day).
  • 30% quick ship fee applies.
CanFab logo

Quality HVAC Accessories

Accessories
Click here for Accessories Quotes

  Adapters
Click here for Adapter Curbs Quotes

Find Your Accessory


Choose your unit









Distributor Login

Username:

Password:

Privacy Policy ©2013 Cannon Fabrication, Inc. All Rights Reserved.
182 Granite Street, Corona, CA 92879
USA Flag
800-232-2632
800-232-2632
Engineering Login

What's New

UPDATED SEISMIC CURB SUBMITTALS & CALCULATIONS
CANFAB STANDARD STOCK INVENTORY PROGRAM
CANFAB MIXING BOXES AND FILTER BOXES FOR MITSUBISHI
CANFAB SEISMICALLY CALCULATED ADJUSTABLE PITCH CURBS